At Action Progex, our mission is to perform top quality work using a personalized approach to meet clients’ needs and budget requirements. In order to reach our goal, the company surrounded itself by skilled and dedicated employees. You can rely on us for all your civil engineering projects.
2011 Construction of a residential development on Rue du Cabotage and Rue du Havre.
2011 Repairs/replacement of water and sewer lines and repairs of municipal streets.
2011 Drinking water supply lines.
2012 Repairs/replacement of water and sewer lines and repairs of municipal streets.
2012 Construction of a residential development on Rue du Phydime-Deschênes.
2011 / 2012 Repairs on route 132. 2 km long of piping installation on route 132.
2013 Street lights bases installation.
2013 Private demolition project.
2013 Repairs/replacement of water and sewer lines and repairs on Rue Frontenac.
2014 Commercial Construction - Tim Hortons.
2014 Replacement of water and sewer lines, and road repairs.
2014 Repairs/replacement of culverts and conducts.
2015 Partner for installation of water and sewer lines.
2015 Development of Havre sur Saint-Laurent. Housing development project of over 150 lots, including infrastructure and landscaping.
2015 / 2016 Biomethanation project.
2016 Reconstruction of Route 230 (Phase 2). Full reconstruction of infrastructure and addition of bike path and lighting system.
2016 Repairs on rue Cométique and rue de la Digue. Full reconstruction of the two main roads of the municipality of Havre-Saint-Pierre.
2016 Pipe laying on one of the biggest construction site in Québec.
2017 Installation of storm sewer lines and reconstruction of infrastructure on Rue Alphonse-Lévesque.
2017 Replacement of water and sewer lines and reconstruction of infrastructure on Rue Rouleau and Rue Sainte-Thérèse.
2017 Replacement of water and sewer lines and reconstruction of infrastructure on Rue Laplante.
2017 Installation of a collection system and an industrial wastewater treatment system for Canadian Pacific Railway’s Côte St-Luc site in Montreal.
2018 Pipe laying on one of the biggest construction site in Québec.
2018 Mise aux normes de l'eau potable (8 millions)
2018 Mise aux normes de l'usine d'eau potable de l'Île-à-la-Crosse.
2018 Réfection des services sur la rue La Montagne (1 million)